WELCOME TO OUR BLOG

We're sharing knowledge in the areas which fascinate us the most
click
February 5th, 2026

Passing IEC 61000-4-2: Diagnosing ESD Failures with a Repeatable Checklist

Failed IEC 61000-4-2 on a control cabinet or rack? Use this step-by-step checklist to reproduce the issue, identify the ESD current path, map symptoms to root causes, and apply fixes that survive retest.
February 4th, 2026

EMC pre-compliance testing: avoid expensive lab failures fast

Learn when to run EMC pre-compliance testing, what it de-risks, and the practical test plan that prevents surprise failures in official compliance labs—especially for industrial control cabinets.
February 2nd, 2026

ESD Safe Cart Grounding: Conductive Casters, Drag Chains, and Verification Steps

How to build an ESD-safe cart for moving sensitive assemblies: grounding methods (conductive casters, drag chains, bonding cables), verification steps, and the records that prevent latent defects.
January 29th, 2026

Control Panel Grounding and Bonding: Failure Modes That Cause EMI and Safety Issues

A practical guide to control cabinet grounding and bonding: protective earth bonding, door bonding, ground loops, shield termination, and inspection records that prevent EMI and safety failures.
January 22nd, 2026

Factory Acceptance Test (FAT) for Control Panels: Checklist + Records Clients Expect

A practical control panel FAT checklist plus the exact records customers expect: test matrix, functional test records, punch list, sign-offs, and a FAT report template structure.
January 21st, 2026

Control Panel Wire Labeling Best Practices (Audit-Ready Wire IDs + Terminal Plans)

A practical wire labeling and terminal ID system for industrial control cabinets—built for maintenance, troubleshooting, and audits. Includes a documentation pack checklist.
January 13th, 2026

IEC 60715 DIN Rail (TS35/TH35) Standard — Dimensions, Hole Pitch & Cabinet Layout Tips

Learn what IEC/EN 60715 actually standardizes for TS35/TH35 DIN rails (35×7.5 vs 35×15, slotted pitch, mounting basics) and the cabinet layout spacing rules panel builders use to avoid rework in U.S. control panels.
November 25th, 2025

Designing Integrated Power Systems for Repeatable UL/CE Compliance and Documentation

Learn how to design industrial control panels and integrated power systems with repeatable UL 508A and CE documentation. Build a CE marking technical file, structure UL 508A control panel design guides, standardize wiring documents and link EMC pre compliance testing into your design-of-record.
Get in Touch with TPS
Name*
Business Email*
Company Name
Country/Region
Inquiry Type*
Application / Industry
What problem are you facing right now?
What are you trying to achieve?
Target Timeline
Budget Range
We use Cookie to improve your online experience. By continuing browsing this website, we assume you agree our use of Cookie.