• eTM-1003F
  • eTM-1003F
  • eTM-1003F
  • eTM-1003F

eTM-1003F

4-digit F Series DC bench power supply with 0–100V adjustable output, 0–3A current, and 300W power in a compact 280 × 130 × 165mm enclosure. Featuring preset voltage and current, power display, ON/OFF output switching, and rear communication for output control and reading, it is ideal for circuit board testing, mobile phone testing, electronics development, and precision high-voltage bench applications.

Input Power
110V input or 100V/220V manual switching
Output Voltage
0-100V
Output Current
0-3A
Set Resolution Voltage
<100V : 10mV ; ≥100V : 0.1V
Set Resolution Current
<10A : 10mA ; ≥10A : 10mA
Set Precision Voltage
≤ 0.1% + 5digits
Set Precision Current
≤ 0.2% +10digits
Ripple Voltage
≤ 18mVrms
Ripple Current
≤ 18mArms
Size / Weight
280(D)x130(W)x165(H)mm/≤2.8kg
  • eTM-1003F
  • eTM-1003F

Description

High-voltage range + 4-digit visibility for faster bench decisions.

30-Second Fit Check
  • 0–100V, 0–3A, up to 300W.
  • 4-digit display supports tighter readback checks.
  • Preset voltage/current + power display for quick validation.
  • Optional RS485/RS232/USB for basic rig integration.
What it is + Why it matters
  • Bench-friendly way to cover higher-voltage DUTs without custom supplies.
  • CV/CC supports controlled bring-up and current limiting.
  • Useful when you need to confirm voltage points quickly during debug.
Key Specs
  • Output: 0–100V, 0–3A (max 300W)
  • Accuracy called out: V ≤0.1%+5 digits; I ≤0.2%+10 digits
  • Ripple (100V class): ≤18mVrms / ≤18mArms
  • Size class: 280×130×165mm
Integration & Controls
  • Rear comms are noted as control/read (not full programming) on this series.
  • Manual input-voltage switching option appears on the platform.
Best for / Not for
  • Best: instrumentation, HV modules, factory verification up to 100V.
  • Not: automated sequences (choose programmable P-series).
Typical Applications
  • High-voltage module testing
  • Industrial lab verification
  • Production test fixtures
  • Electronics troubleshooting
Selection Checklist
  • Confirm current stays within 3A at your target voltage.
  • Choose comms option if you’ll log or control output.
  • Use HV-safe leads and “set limit then enable.”
RFQ Quick Checklist: qty • delivery • V/I range • comms (Y/N) • fixture constraints.
Note: Final compliance and performance depend on end-product design and verification testing.

Download

Get in Touch with TPS
Name*
Business Email*
Company Name
Country/Region
Inquiry Type*
Application / Industry
What problem are you facing right now?
What are you trying to achieve?
Target Timeline
Budget Range
We use Cookie to improve your online experience. By continuing browsing this website, we assume you agree our use of Cookie.