• K19H-UP1000S36
  • K19H-UP1000S36

K19H-UP1000S36

High-density K19H-UP1000S Series switching mode power supply with 36VDC output, 28A rated current, and 1008W power in a slim 214 × 82 × 48mm enclosure. With 90–264VAC universal input, up to 93% efficiency, active PFC, ±5% output adjustment, and multiple protection features, it is ideal for industrial automation equipment, control systems, and compact embedded power solutions.

Input Current
5A/230Vac 11A@110Vac
Input Voltage Rage
90V~264V AC
Output Rated Current
28A
Output Voltage
+36V DC
Rated Power
1008W
Output Adjustable Range
±5%
Output Accuracy
±1%
Efficiency @230Vac
93%
Size/Weight
214*82*48mm(L*W*H)/1.2Kg
  • K19H-UP1000S36

Description

30-Second Fit Check

  • Output class: 36VDC, 28A (1008W).
  • AC input: 90–264VAC (rated input voltage listed 100–240VAC), 50–60Hz.
  • Efficiency: 93% @230VAC (listed).
  • Ripple & noise: 360mVp-p.
  • Trim range: ±5% adjustable output.
  • Terminal style (listed): 36V is above 28V, so output uses 4P (8.25) terminal; input terminal 3P-8.25.

What It Is + Why It Matters

  • High-power 36V rail supply for industrial control and automation systems where a 1kW-class supply is required.
  • 4P output terminal arrangement (listed) can help with higher-voltage distribution planning inside equipment.
  • Lock-style short/OVP behavior is defined—plan your service and reset procedures up front.
  • Active PFC and universal input are listed for consistent AC-side behavior across regions.

Key Specs

  • Rated output: 36V, 28A; 1008W.
  • Ripple & noise: 360mVp-p.
  • Accuracy/regulation: ±1% accuracy; line ±0.5%; load ±0.5%.
  • Input: 90–264VAC; input current 5A @230VAC / 11A @110VAC; inrush 60A @230VAC.
  • Power factor (listed): PF >0.98 @100V; PF >0.95 @230V.
  • Leakage: <0.75mA @240V.
  • Timing: 500ms/30ms/5ms @115VAC; 300ms/30ms/10ms @230VAC (setup/rise/hold).
  • Size/weight: 214×82×48mm; 1.2kg; MTBF >50k hrs (MIL-HDBK-217F, 25°C) listed.
  • Operating environment: -20 to 60°C; 10–90% RH (non-condensing).

Integration & Controls

  • Terminals (listed): input 3P-8.25; output 4P (8.25) for voltages above 28V.
  • Brown-out: ≤70VAC auto recovery (listed).
  • Thermal behavior: shell temp >115°C output off; automatic recovery (listed).
  • Reset expectation: short and over-voltage protections are lock-style and require power off for 5 minutes to restore.

Best For / Not For

  • Best for: 36V industrial control, automation systems, and high-power equipment rails up to 28A.
  • Not for: systems that require uninterrupted output after fault events without manual reset procedures.
  • Not for: enclosures without airflow/spacing planning for open-frame supplies.

Typical Applications

  • Industrial control and automation systems
  • High-power equipment-level DC rails
  • Panel builds requiring universal AC input
  • Test stations and distribution cabinets

Selection Checklist

  • Confirm output requirement: 36V / 28A (include peak headroom).
  • Confirm ripple tolerance: 360mVp-p.
  • Confirm terminal fit: 4P (8.25) output terminal arrangement (listed).
  • Confirm upstream circuit capacity for 1kW-class inrush and steady draw.
  • Confirm lock-style recovery procedures fit your ops/service model.
  • Plan airflow and clearance in the end enclosure.
RFQ Quick Checklist: qty, target delivery, mains voltage, load profile, terminal/wire constraints, enclosure airflow notes, documentation needs.
Note: final compliance and performance depend on end-product design and verification testing.

Reliability, Protections & Standards

  • Overload: 105–150% hiccup, automatic recovery.
  • Short circuit: lock; restore after power off for 5 minutes.
  • Over-voltage: Vout 120%–140% lock; restore after power off for 5 minutes.
  • Safety standards listed: GB4943, EN 60950-1, EN 62368-1.
  • EMC standards listed: GB/T9254-2008, GB17625.1-2012, EN 55032 Class B, EN 61000-3-2.

Download

Get in Touch with TPS
Name*
Business Email*
Company Name
Country/Region
Inquiry Type*
Application / Industry
What problem are you facing right now?
What are you trying to achieve?
Target Timeline
Budget Range
We use Cookie to improve your online experience. By continuing browsing this website, we assume you agree our use of Cookie.